Where Edgewater’s Stormwater Money Goes

Where Edgewater plans to spend its stormwater fees, from canal repairs to pump projects.

Where Edgewater’s Stormwater Money Goes

Edgewater’s standard residential stormwater charge rose from $14.58 to $19.61 a month on October 1 under the fee schedule approved in August. The city has outlined where it plans to put stormwater money: routine maintenance, canal improvements and pump projects, with much of the larger work still in design and engineering.

The budget book reports $2.78 million in stormwater service charges collected during fiscal 2025. Those charges support the drainage system’s staff, equipment and improvements. They are separate from drinking-water and sewer charges.

Our utility-bill breakdown and calculator explain the other charges and let you estimate a household bill.

The projects in the budget

Council adopted the final budget September 28. The detailed book posted online still carries the proposed label. Its capital plan lists $6,865,550 for stormwater projects in fiscal 2026–27:

• $2,631,300 for 18th Street Canal improvement and widening design. The proposed work would widen the canal from Travelers Palm Drive to its outfall at East Indian River Boulevard, enlarge road crossings, stabilize the banks and add tide gates to limit water backing in from the river.

• $2,182,400 for reuse-pond pump design at Mango/12th. A proposed station at Mango Tree Drive and 12th Street would lower the pond before storms to make room for runoff, pumping water through a pipe to a river outfall at the east end of Virginia Street.

• $1,000,000 for pump-station design at Mango and Queen ponds. The broader proposal calls for three stations at existing ponds in southern Florida Shores, sharing a pipe system to move stormwater to the river. The final route would be refined during design.

• $851,850 for 27th-to-E9 Canal engineering. Engineers would study a connection toward Silver Palm Canal and Turnbull Hammock, giving E9 another drainage route while keeping its existing 18th Street Canal outlet. Surveys and modeling would evaluate possible routes, road crossings and effects on existing infrastructure.

• $200,000 for miscellaneous stormwater upgrades. This is a general allowance; the budget table does not assign it to individual locations or jobs.

The proposed project descriptions come from the city’s stormwater master plan and the 27th-to-E9 engineering scope. These budget amounts cover design and engineering for the named projects, not confirmation that the full construction is funded or complete.

Donut chart of Edgewater’s planned FY 2026–27 stormwater projects, totaling $6,865,550: 18th Street Canal improvement and widening design, $2,631,300 (38.3%); reuse-pond pump design at Mango/12th, $2,182,400 (31.8%); pump-station design at Mango and Queen ponds, $1,000,000 (14.6%); 27th-to-E9 Canal engineering, $851,850 (12.4%); miscellaneous upgrades, $200,000 (2.9%). Source: published proposed capital plan, page 342. These are planned amounts, not actual spending.
Planned FY 2026–27 stormwater project amounts in Edgewater’s published proposed capital plan (p. 342).

The plan’s funding breakdown assigns about $1.05 million to rates, $1 million to grants and $4.81 million to debt. These are planned funding sources and project amounts, not a tally of money already spent. Transfers between operating and capital funds move the same money and should not be counted twice.

Council also approved an internal credit line of up to $2 million from the General Fund to cover temporary stormwater cash-flow needs. Advances must be repaid with interest. The authorization does not establish how much has been drawn.

Work on the ground

On September 28, council approved a $94,034 engineering proposal addressing erosion and unstable slopes along approximately 750 feet of the 18th Street Canal between U.S. 1 and South Riverside Drive. That approval covers investigation, design and permitting to prepare repairs for construction.

At Duck Lake, the city’s September 28 update described installation of approximately 700 feet of 8-inch pipe, giving crews a direct pumping route to the 18th Street Canal. Previously, water was pumped west into a smaller canal. The new pipe is for pumping when needed, rather than a conventional outfall.

On October 10, a red city-marked pump sat beside Duck Lake, with ducks gathered around the trailer. A long hose ran along roadside lawns, and a black hose entered a concrete drainage inlet nearby.

The city also reported installing five canal monitors in March. Using solar power and cellular connections, the devices transmit readings including water levels, flow rates and rainfall. The city says that information helps staff respond during storms and plan future improvements.

Routine work continues alongside those projects. The stormwater division maintains canals, ponds and roadside swales. In Florida Shores, swales hold some runoff so it can soak into the soil and be treated before reaching the lagoon.

Residents can report obvious blockages, or standing water after a week without rain, at 386-424-2400, extension 4007.

Our Watchdog tools let you compare budget snapshots in Local Budgets and search recorded decisions in Council Votes. Browse nearby reporting on Stories on the Map. For background on development west of I-95, read The Wild West (of 95): Deering Park.